PH 17&18
WASTE WATER
TREATMENT PLANT UNIT 129
Assaluyeh
200 m3/hr
South Pars Gas Field
Phases 17 & 18/ IPMI
Treatment Method
Include Spent caustic + Sanitary +OILY Waste Water API, IGF, Neutralization, Aeration, Clarifier, Chlorination, Storm Basin 20000 m3
SUSTAINABLE SOLUTIONS.
FOR A BETTER LIFE.
In the equipment supply and procurement, this has close commercial deals with internationally approved and popular manufacturers across the Europe for valves, control system, pumps and etc., as per the industry requirements. Shafab is proud of continuous development in its engineers’ knowledge through endless training aiming to expand the R&D sector’s expertise. At the same time, these activities are supported with technical interaction with international R&D centers across the world which has made us the bests.